T
From Algorithm Wiki
Each movie can be modeled as a vertex, each pair of films can be modeled as an edge between the two film vertices. If it is possible to make this a two-color graph, a schedule is possible. Films of one color would be shown Saturday, and the rest would be shown Sunday.